{"id":64085,"date":"2015-04-17T12:27:37","date_gmt":"2015-04-17T05:27:37","guid":{"rendered":"https:\/\/www.ekuatorial.com\/2015\/04\/lampungs-dilemma-between-energy-and-forestry\/"},"modified":"2015-04-17T12:27:37","modified_gmt":"2015-04-17T12:27:37","slug":"lampungs-dilemma-between-energy-and-forestry","status":"publish","type":"post","link":"https:\/\/www.ekuatorial.com\/en\/2015\/04\/lampungs-dilemma-between-energy-and-forestry\/","title":{"rendered":"Lampung&#8217;s dilemma between energy and forestry"},"content":{"rendered":"<p><strong>Bandarlampung, Ekuatorial<\/strong> &#8211; High Voltage Air Channels or SUTT development from Kemuning hill of North Lampung to Liwa and Krui in <a href=\"https:\/\/ekuatorial.com\/climate-change\/composting-to-prevent-forest-fires-in-west-lampung\" title=\"Composting to prevent forest fires in West Lampung\">West Lampung<\/a> got stalled due to forestry permit, said an official in Bandarlampung, on Thursday (16\/4). <\/p>\n<p>&#8220;The 30 Megawatt channels covers 70 kilometers of area which passes through residents but also Bukit Barisan Selatan National Park, a total of 22 hectares,&#8221; said Adril Fajri, Unit Manager of Lampung Region, State Electricity Company (PLN). <\/p>\n<p>Up to date, Fajri said that only 60 out of 184 towers were already constructed while the rest was still waiting for permit process. <\/p>\n<p>&#8220;We don&#8217;t want to cut the forest, but that&#8217;s the only path available for man. As a result, we have to built the tower there,&#8221; he said adding that the development is meant to provide electricity for 30,000 customers in West Lampung. <\/p>\n<p>Meanwhile, Alam Awaluddin PLN&#8217;s Lampung Distribution Manager, said that Liwa and Krui electricity consumption have been fulfilled from main tower located in Kemuning Hill of North Lampung. However, Awaluddin said that it could no longer provide electricity needs of Liwa and Krui.  <\/p>\n<p>He said that lots of installed network were damaged because of geographical condition and unstable soil construction. <\/p>\n<p>&#8220;The state could no longer fund to solve the same issue,&#8221; he said. &#8220;We just want to remind President&#8217;s promise to simplify  permits for greater good.&#8221; <\/p>\n<p>Nizom, head of West Lampung Forestry Agency said that central government has yet to issue lend-use permit for the 22 hectares of protected forest areas as there were some requirements need to be fulfilled. <\/p>\n<p>Based on the letter of Forestry Planology Directorate General, issued on October 13, 2014, PLN must make a statement that the company would have to do reclamation and forest re-vegetation without have to wait the end of the permit.<\/p>\n<p>In addition, PLN must also compensated twice of the land that was used for the development. &#8220;We are just following rules. We really want to support PLN as it is for people&#8217;s interest but we don&#8217;t want to instead create more problems,&#8221; he said. <strong>Eni Muslihah<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bandarlampung, Ekuatorial &#8211; High Voltage Air Channels or SUTT development from Kemuning hill of North Lampung to Liwa and Krui in West Lampung got stalled due to forestry permit, said an official in Bandarlampung, on Thursday (16\/4). &#8220;The 30 Megawatt channels covers 70 kilometers of area which passes through residents but also Bukit Barisan Selatan [&hellip;]<\/p>\n","protected":false},"author":2024,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[3907,4051,3948,3951],"tags":[],"partner":[],"coauthors":[],"class_list":["post-64085","post","type-post","status-publish","format-standard","hentry","category-article","category-energy","category-java","category-nusa-tenggara-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.5 (Yoast SEO v27.5) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Lampung&#039;s dilemma between energy and forestry<\/title>\n<meta name=\"description\" content=\"Bandarlampung, Ekuatorial - High Voltage Air Channels or SUTT development from Kemuning hill of North Lampung to Liwa and Krui in West Lampung got stalled\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ekuatorial.com\/en\/2015\/04\/lampungs-dilemma-between-energy-and-forestry\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lampung&#039;s dilemma between energy and forestry\" \/>\n<meta property=\"og:description\" content=\"Bandarlampung, Ekuatorial - High Voltage Air Channels or SUTT development from Kemuning hill of North Lampung to Liwa and Krui in West Lampung got stalled\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ekuatorial.com\/en\/2015\/04\/lampungs-dilemma-between-energy-and-forestry\/\" \/>\n<meta property=\"og:site_name\" content=\"Ekuatorial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Ekuatorial\/\" \/>\n<meta property=\"article:published_time\" content=\"2015-04-17T05:27:37+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2015-04-17T12:27:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/www.ekuatorial.com\/wp-content\/uploads\/2018\/10\/Ekuatorial-Social-Media.png?fit=1080%2C1080&ssl=1\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ekuatorialmap\" \/>\n<meta name=\"twitter:site\" content=\"@ekuatorialmap\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/2015\\\/04\\\/lampungs-dilemma-between-energy-and-forestry\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/2015\\\/04\\\/lampungs-dilemma-between-energy-and-forestry\\\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"Lampung&#8217;s dilemma between energy and forestry\",\"datePublished\":\"2015-04-17T05:27:37+00:00\",\"dateModified\":\"2015-04-17T12:27:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/2015\\\/04\\\/lampungs-dilemma-between-energy-and-forestry\\\/\"},\"wordCount\":347,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/#organization\"},\"articleSection\":[\"Article\",\"Energy\",\"Java\",\"Nusa Tenggara\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/2015\\\/04\\\/lampungs-dilemma-between-energy-and-forestry\\\/#respond\"]}],\"copyrightYear\":\"2015\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/www.ekuatorial.com\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/2015\\\/04\\\/lampungs-dilemma-between-energy-and-forestry\\\/\",\"url\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/2015\\\/04\\\/lampungs-dilemma-between-energy-and-forestry\\\/\",\"name\":\"Lampung's dilemma between energy and forestry\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/#website\"},\"datePublished\":\"2015-04-17T05:27:37+00:00\",\"dateModified\":\"2015-04-17T12:27:37+00:00\",\"description\":\"Bandarlampung, Ekuatorial - High Voltage Air Channels or SUTT development from Kemuning hill of North Lampung to Liwa and Krui in West Lampung got stalled\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/2015\\\/04\\\/lampungs-dilemma-between-energy-and-forestry\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/2015\\\/04\\\/lampungs-dilemma-between-energy-and-forestry\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/2015\\\/04\\\/lampungs-dilemma-between-energy-and-forestry\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lampung&#8217;s dilemma between energy and forestry\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/\",\"name\":\"Ekuatorial\",\"description\":\"Data. Maps. Storytelling.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/#organization\",\"name\":\"Ekuatorial\",\"url\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/www.ekuatorial.com\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/ekuatorial-logo.png?fit=1600%2C600&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/www.ekuatorial.com\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/ekuatorial-logo.png?fit=1600%2C600&ssl=1\",\"width\":1600,\"height\":600,\"caption\":\"Ekuatorial\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/Ekuatorial\\\/\",\"https:\\\/\\\/x.com\\\/ekuatorialmap\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCCGP9Ia-Muud1Gv7YshQIEA\",\"https:\\\/\\\/www.instagram.com\\\/Ekuatorial_com\"]},{\"@type\":\"Person\",\"@id\":\"\",\"url\":\"https:\\\/\\\/www.ekuatorial.com\\\/en\\\/author\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Lampung's dilemma between energy and forestry","description":"Bandarlampung, Ekuatorial - High Voltage Air Channels or SUTT development from Kemuning hill of North Lampung to Liwa and Krui in West Lampung got stalled","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ekuatorial.com\/en\/2015\/04\/lampungs-dilemma-between-energy-and-forestry\/","og_locale":"en_US","og_type":"article","og_title":"Lampung's dilemma between energy and forestry","og_description":"Bandarlampung, Ekuatorial - High Voltage Air Channels or SUTT development from Kemuning hill of North Lampung to Liwa and Krui in West Lampung got stalled","og_url":"https:\/\/www.ekuatorial.com\/en\/2015\/04\/lampungs-dilemma-between-energy-and-forestry\/","og_site_name":"Ekuatorial","article_publisher":"https:\/\/www.facebook.com\/Ekuatorial\/","article_published_time":"2015-04-17T05:27:37+00:00","article_modified_time":"2015-04-17T12:27:37+00:00","og_image":[{"width":1080,"height":1080,"url":"https:\/\/i0.wp.com\/www.ekuatorial.com\/wp-content\/uploads\/2018\/10\/Ekuatorial-Social-Media.png?fit=1080%2C1080&ssl=1","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_creator":"@ekuatorialmap","twitter_site":"@ekuatorialmap","twitter_misc":{"Written by":"","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.ekuatorial.com\/en\/2015\/04\/lampungs-dilemma-between-energy-and-forestry\/#article","isPartOf":{"@id":"https:\/\/www.ekuatorial.com\/en\/2015\/04\/lampungs-dilemma-between-energy-and-forestry\/"},"author":{"name":"","@id":""},"headline":"Lampung&#8217;s dilemma between energy and forestry","datePublished":"2015-04-17T05:27:37+00:00","dateModified":"2015-04-17T12:27:37+00:00","mainEntityOfPage":{"@id":"https:\/\/www.ekuatorial.com\/en\/2015\/04\/lampungs-dilemma-between-energy-and-forestry\/"},"wordCount":347,"commentCount":0,"publisher":{"@id":"https:\/\/www.ekuatorial.com\/en\/#organization"},"articleSection":["Article","Energy","Java","Nusa Tenggara"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.ekuatorial.com\/en\/2015\/04\/lampungs-dilemma-between-energy-and-forestry\/#respond"]}],"copyrightYear":"2015","copyrightHolder":{"@id":"https:\/\/www.ekuatorial.com\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.ekuatorial.com\/en\/2015\/04\/lampungs-dilemma-between-energy-and-forestry\/","url":"https:\/\/www.ekuatorial.com\/en\/2015\/04\/lampungs-dilemma-between-energy-and-forestry\/","name":"Lampung's dilemma between energy and forestry","isPartOf":{"@id":"https:\/\/www.ekuatorial.com\/en\/#website"},"datePublished":"2015-04-17T05:27:37+00:00","dateModified":"2015-04-17T12:27:37+00:00","description":"Bandarlampung, Ekuatorial - High Voltage Air Channels or SUTT development from Kemuning hill of North Lampung to Liwa and Krui in West Lampung got stalled","breadcrumb":{"@id":"https:\/\/www.ekuatorial.com\/en\/2015\/04\/lampungs-dilemma-between-energy-and-forestry\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ekuatorial.com\/en\/2015\/04\/lampungs-dilemma-between-energy-and-forestry\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.ekuatorial.com\/en\/2015\/04\/lampungs-dilemma-between-energy-and-forestry\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ekuatorial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Lampung&#8217;s dilemma between energy and forestry"}]},{"@type":"WebSite","@id":"https:\/\/www.ekuatorial.com\/en\/#website","url":"https:\/\/www.ekuatorial.com\/en\/","name":"Ekuatorial","description":"Data. Maps. Storytelling.","publisher":{"@id":"https:\/\/www.ekuatorial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ekuatorial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.ekuatorial.com\/en\/#organization","name":"Ekuatorial","url":"https:\/\/www.ekuatorial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ekuatorial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/i0.wp.com\/www.ekuatorial.com\/wp-content\/uploads\/2021\/04\/ekuatorial-logo.png?fit=1600%2C600&ssl=1","contentUrl":"https:\/\/i0.wp.com\/www.ekuatorial.com\/wp-content\/uploads\/2021\/04\/ekuatorial-logo.png?fit=1600%2C600&ssl=1","width":1600,"height":600,"caption":"Ekuatorial"},"image":{"@id":"https:\/\/www.ekuatorial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Ekuatorial\/","https:\/\/x.com\/ekuatorialmap","https:\/\/www.youtube.com\/channel\/UCCGP9Ia-Muud1Gv7YshQIEA","https:\/\/www.instagram.com\/Ekuatorial_com"]},{"@type":"Person","@id":"","url":"https:\/\/www.ekuatorial.com\/en\/author\/"}]}},"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack-related-posts":[{"id":102117,"url":"https:\/\/www.ekuatorial.com\/en\/2024\/12\/how-is-the-development-of-the-equitable-energy-transition-program-in-indonesia\/","url_meta":{"origin":64085,"position":0},"title":"How is the development of the equitable energy transition program in Indonesia?","author":"Redaksi Ekuatorial","date":"December 26, 2024","format":false,"excerpt":"JETP funds will target equitable energy transition projects in a number of developing countries, one of which is Indonesia.","rel":"","context":"In &quot;Article&quot;","block_context":{"text":"Article","link":"https:\/\/www.ekuatorial.com\/en\/category\/type\/article\/"},"img":{"alt_text":"Indonesia's Green Energy Transition. Indonesia's JETP Progress: $21.6 Billion Green Energy Investment Plan Targets Renewable Power and Job Creation.","src":"https:\/\/www.ekuatorial.com\/wp-content\/uploads\/2024\/12\/WhatsApp-Image-2024-12-17-at-10.25.58-jpeg.avif","width":350,"height":200,"srcset":"https:\/\/www.ekuatorial.com\/wp-content\/uploads\/2024\/12\/WhatsApp-Image-2024-12-17-at-10.25.58-jpeg.avif 1x, https:\/\/www.ekuatorial.com\/wp-content\/uploads\/2024\/12\/WhatsApp-Image-2024-12-17-at-10.25.58-jpeg.avif 1.5x, https:\/\/www.ekuatorial.com\/wp-content\/uploads\/2024\/12\/WhatsApp-Image-2024-12-17-at-10.25.58-jpeg.avif 2x"},"classes":[]},{"id":102115,"url":"https:\/\/www.ekuatorial.com\/en\/2024\/10\/jetp-and-the-reluctance-of-developed-countries-to-pay-climate-debt\/","url_meta":{"origin":64085,"position":1},"title":"JETP and the reluctance of developed countries to pay \u201cclimate debt\u201d","author":"Redaksi Ekuatorial","date":"October 30, 2024","format":false,"excerpt":"The majority of public financing in the JETP project is loans, not grants. Developed countries are seen as reluctant to pay climate debt.","rel":"","context":"In &quot;Article&quot;","block_context":{"text":"Article","link":"https:\/\/www.ekuatorial.com\/en\/category\/type\/article\/"},"img":{"alt_text":"Ilustrasi JETP","src":"https:\/\/i0.wp.com\/www.ekuatorial.com\/wp-content\/uploads\/2022\/11\/Telaah_Utang_Transisi_Energi.jpeg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.ekuatorial.com\/wp-content\/uploads\/2022\/11\/Telaah_Utang_Transisi_Energi.jpeg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.ekuatorial.com\/wp-content\/uploads\/2022\/11\/Telaah_Utang_Transisi_Energi.jpeg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.ekuatorial.com\/wp-content\/uploads\/2022\/11\/Telaah_Utang_Transisi_Energi.jpeg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.ekuatorial.com\/wp-content\/uploads\/2022\/11\/Telaah_Utang_Transisi_Energi.jpeg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":101837,"url":"https:\/\/www.ekuatorial.com\/en\/2024\/12\/indonesias-green-energy-transition-jetp-secures-1-billion-for-electrification-projects\/","url_meta":{"origin":64085,"position":2},"title":"Indonesia&#8217;s Green Energy Transition: JETP Secures $1 Billion for Electrification Projects","author":"Redaksi Ekuatorial","date":"December 11, 2024","format":false,"excerpt":"Indonesia's JETP Progress: $21.6 Billion Green Energy Investment Plan Targets Renewable Power and Job Creation","rel":"","context":"In &quot;Article&quot;","block_context":{"text":"Article","link":"https:\/\/www.ekuatorial.com\/en\/category\/type\/article\/"},"img":{"alt_text":"Indonesia's Green Energy Transition. Indonesia's JETP Progress: $21.6 Billion Green Energy Investment Plan Targets Renewable Power and Job Creation.","src":"https:\/\/www.ekuatorial.com\/wp-content\/uploads\/2024\/12\/WhatsApp-Image-2024-12-17-at-10.25.58-jpeg.avif","width":350,"height":200,"srcset":"https:\/\/www.ekuatorial.com\/wp-content\/uploads\/2024\/12\/WhatsApp-Image-2024-12-17-at-10.25.58-jpeg.avif 1x, https:\/\/www.ekuatorial.com\/wp-content\/uploads\/2024\/12\/WhatsApp-Image-2024-12-17-at-10.25.58-jpeg.avif 1.5x, https:\/\/www.ekuatorial.com\/wp-content\/uploads\/2024\/12\/WhatsApp-Image-2024-12-17-at-10.25.58-jpeg.avif 2x"},"classes":[]},{"id":63787,"url":"https:\/\/www.ekuatorial.com\/en\/2014\/12\/rajabasa-geothermal-project-starts-construction-phase\/","url_meta":{"origin":64085,"position":3},"title":"Rajabasa geothermal project starts construction phase","author":"","date":"December 3, 2014","format":false,"excerpt":"Bandarlampung, Ekuatorial - After rejected by local villagers, geothermal power plant in Mount Rajabasa, South Lampung, has begun construction in early December, said Franky Tungka, Site Support Manager of PT Supreme Energy, a company focus on geothermal energy mostly working Sumatra island, recently. The first construction, Tungka said, was to\u2026","rel":"","context":"In &quot;Article&quot;","block_context":{"text":"Article","link":"https:\/\/www.ekuatorial.com\/en\/category\/type\/article\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":101100,"url":"https:\/\/www.ekuatorial.com\/en\/2024\/02\/the-struggle-of-indigenous-women-in-mentawai-to-get-clean-water\/","url_meta":{"origin":64085,"position":4},"title":"The struggle of indigenous women in Mentawai to get clean water","author":"Rus Akbar Saleleubaja","date":"February 8, 2024","format":false,"excerpt":"Exploitation of the forests of South Pagai and North Pagai Islands in the Mentawai Islands has caused indigenous women to have difficulty obtaining clean water.","rel":"","context":"In &quot;Article&quot;","block_context":{"text":"Article","link":"https:\/\/www.ekuatorial.com\/en\/category\/type\/article\/"},"img":{"alt_text":"Air terjun Matobat","src":"https:\/\/i0.wp.com\/www.ekuatorial.com\/wp-content\/uploads\/2024\/01\/1-scaled.jpeg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.ekuatorial.com\/wp-content\/uploads\/2024\/01\/1-scaled.jpeg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.ekuatorial.com\/wp-content\/uploads\/2024\/01\/1-scaled.jpeg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.ekuatorial.com\/wp-content\/uploads\/2024\/01\/1-scaled.jpeg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.ekuatorial.com\/wp-content\/uploads\/2024\/01\/1-scaled.jpeg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":63981,"url":"https:\/\/www.ekuatorial.com\/en\/2015\/02\/state-owned-companies-earned-bad-rating-in-environmental-performance\/","url_meta":{"origin":64085,"position":5},"title":"State-owned companies earned bad rating in environmental performance","author":"","date":"February 26, 2015","format":false,"excerpt":"Bandarlampung, Ekuatorial \u2013 Two state-owned power plants and hospital in Lampung earned poor rating on environmental performance according to Ministry of Environment and Forestry, said an official on Wednesday (25\/2), in Bandarlampung. The rating, dubbed as PROPER [Environmental Performance Evaluation Rating Program], is an annual program set up by the\u2026","rel":"","context":"In &quot;Article&quot;","block_context":{"text":"Article","link":"https:\/\/www.ekuatorial.com\/en\/category\/type\/article\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.ekuatorial.com\/en\/wp-json\/wp\/v2\/posts\/64085","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ekuatorial.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ekuatorial.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ekuatorial.com\/en\/wp-json\/wp\/v2\/users\/2024"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ekuatorial.com\/en\/wp-json\/wp\/v2\/comments?post=64085"}],"version-history":[{"count":0,"href":"https:\/\/www.ekuatorial.com\/en\/wp-json\/wp\/v2\/posts\/64085\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.ekuatorial.com\/en\/wp-json\/wp\/v2\/media?parent=64085"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ekuatorial.com\/en\/wp-json\/wp\/v2\/categories?post=64085"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ekuatorial.com\/en\/wp-json\/wp\/v2\/tags?post=64085"},{"taxonomy":"partner","embeddable":true,"href":"https:\/\/www.ekuatorial.com\/en\/wp-json\/wp\/v2\/partner?post=64085"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/www.ekuatorial.com\/en\/wp-json\/wp\/v2\/coauthors?post=64085"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}